A quick update! Doing more roof in the morning. The adhesive didn’t come in for the weekend so it wont get finished tomorrow but it’s probably good to break it up a little anyway with the 100 degree weather slated over the next week. We have a gallon and a half of adhesive so I’m thinking we can get 1 -1.5 more sheets up. I still need to run and grab about 30 more pallets. I need to remove the nails from the ones disassembled today and plane them all down a bit then I am ready to get going there too! I got the kitchen sink, the only big items left to purchase that I can think of right now is the washer/dryer and the finishes (drywall, tile, counter-tops/counter materials etc.). Here is what I have for now:
-
-
I got this kitchen sink today from Craigslist. It is an undermount white sink, brand new, never installed. I bought it for about 15% of the cost. Win!
-
-
I had just shy of 30 pallets to disassemble, I was super excited to use the tool Nate made me listed in the previous post.
-
-
20 minutes later I was half way done…
-
-
40 minutes, all done! Amazing! Thank you Nathan! This would have taken about 4 days with the cat claw/hammer like I was doing before 🙂
-
-
I got my Ivy clippings for the roof today also. I stole these from the yard at my work, they are ripping out all the ivy this week i was told so I thought I had better hurry and grab some while it was there. This is my roof 🙂
-
-
The only con is having girly little office hands… I got a blister.
-
-
How long does it take for these things to go away. This is from when I hammered my finger installing the light receptacles a LONG time ago.
-
-
My water filter is in under the bathroom sink.
-
-
My shower head and control piece is in and ready to go!
-
-
For the lav in the bathroom.
Tagged: Construction, Dad, Macy Miller, Pallets, Siding, Welding
good job!
Thanks Rob!
One of your pics looks like you totally mushed a white lab rat 🙂
Ha! I wasn’t seeing it but then I found it! I didn’t, I assure you! 🙂